Seven services delivered as one accountable engineering team. From the first concept sketch through commissioning and after-sale, we don't sub out the engineering — and we don't subcontract responsibility for it either.
Complete pre-engineered steel building solutions — optimised structural design, quality fabrication, and efficient supply of structural and cladding components. We design every primary frame to your loads and clear-span requirements, not from a catalogue.
Comprehensive construction delivery — civil, structural, HVAC and electrical — from concept to commissioning under one team. Single PM, single BOQ, single point of accountability through to handover and after-sale.
Integrated PEB delivery including foundations, flooring, site development and ancillary civils. The advantage of a single team coordinating the geotech, the embeds and the steel — fewer interfaces, faster execution.
Hot-rolled steel buildings — columns, beams, trusses, bracing systems — designed, detailed, fabricated and supplied to standard codes. High strength and durability where heavy point loads or non-standard geometries call for a conventional approach over PEB.
Meticulous planning, coordination and oversight to keep projects on schedule and within budget without quality compromise. We can run PM as a standalone service for clients with their own contractor stack.
Independent audits and design validation of existing or proposed structures. We certify against IS / IRC / AISC codes, run third-party FEA where required, and produce signed audit reports for insurance, statutory and lender review.
From initial concept to issue-for-construction. Structural analysis, material selection, code compliance and full shop-drawing packages — including connections, embeds and erection sequences.
Five gates between a brief and a handover. Each is signed off — drawings, BOQ, schedule, snags, completion certificate.
We walk the site, understand the load, the access, the soil, and the operational constraints. Within 48 hours.
Concept structural scheme, BOQ to ±5%, indicative schedule. You can shop the number around — most don't.
IFC drawings, shop drawings, embed schedules, BBS. Senior engineer review before every release.
In-house fabrication; calibrated welding; weekly site reviews with photos and weld-test reports.
Snag-list closure, completion certificate, AMC. Reliable after-sale that keeps the facility running.
A representative project — chosen because it touched almost every service we offer.
A 48,000 sq.ft component manufacturing block for an established Tier-1 automotive supplier. PEB primary, conventional crane-rail support steel, full civil scope, MEP and statutory.
Currently 70% structurally complete; crane-rail commissioning scheduled for Q3 2026.
All projects →Six things people ask before they sign. If yours isn't here, send it across.
We'd rather walk a site than read a slide deck. Send us what you've got and we'll come look.